Scored by probability × impact, one to five each.
Your risk matrix
Add risks with a probability and an impact to see the matrix and the ranked list here.
The matrix
Priority, highest to lowest
How to read itThe matrix orders the conversation, it does not decide for you. Two risks of opposite natures can share a score, and a rare, heavy risk can deserve more than its score suggests.
Take the full report
Your ranked risk list, what each band means, the treatment plan by level, the method caveat and the sources, in a report designed to keep and print. Leave your email and download it now.
Done.
You will get the next management article by email. Your report is below.
Add at least one risk with a probability and an impact to generate the report.
Every farm carries more risks than it can treat at once. Give each one a probability and an impact rating, one to five, and see right away which ones deserve attention first, on the matrix and the ranked list.
Rate each risk one to five for how likely it is and one to five for how much it would cost, multiply, and a score of one to twenty-five falls out. Only four of the twenty-five cells reach critical, where a probable event meets a heavy one, with the tool cutting the bands at one to four low, five to nine medium, ten to fifteen high and sixteen to twenty-five critical.
The rule is the one the NIST guide states, that a risk level is a combination of likelihood and impact, and the cuts are set so a smaller score never wears a worse color than a larger one. The order the scores produce is the whole output: the matrix says which risk to work on before the rest, not how to treat it.